18 Years Factory China High Heat Resistant Casters Factories - EF8 Series- Threaded stem type(Round)(Chrome-plating) – GLOBE

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

In the past few years, our company absorbed and digested advanced technologies both at home and abroad. Meanwhile, our company staffs a team of experts devoted to the development of Small Casters Wheels , Scaffolding Caster Wheel , Bolt Hole Caster , Please feel free to contact us at any time. We will reply you when we receive your inquiries. Please note that samples are available before we start our business.
18 Years Factory China High Heat Resistant Casters Factories - EF8 Series- Threaded stem type(Round)(Chrome-plating) – GLOBE Detail:

18-1ef8
EF8-Y

Advantages on our products:

1. High quality materials purchased with strictly quality check.

2. Each product checked strictly before packing.

3. We are professional manufacturer for over 25 years.

4. Trial order or mixed orders are accepted.

5. OEM orders are welcome.

6. Prompt delivery.

7) Any type of casters and wheels can be customized.

company introduction

Contact Us Today

We adopted advanced technology, equipment and high-quality materials to ensure the flexibility, convenience and durability of our products. In different circumstances, our products have wear, collision, chemical corrosion, low/high temperature resistance, trackless, floor protection and low noise features.

75mm-100mm-125mm-Swivel-PU-Trolley-Caster-Wheel-with-Threaded-Stem-Brake-Wheel-Castor (2)

Testing

75mm-100mm-125mm-Swivel-PU-Trolley-Caster-Wheel-with-Threaded-Stem-Brake-Wheel-Castor (3)

Workshop

What are the common problems in the selection of bowl buckle scaffolding casters?

1. When using bowl buckle scaffolding, the bottom end must be covered with scaffolding, and side guard rails and body guardrails should be set on both sides;

2. When it is necessary to buckle the scaffolding, all the staff should be allowed to descend from the steel pipe scaffolding work platform to the road in advance, and then they can move;

3. After moving in time, step on the brake pedal of the wheel to lock the wheel;

4. During work, prevent the support frame from being subjected to unexpected level shocks and collisions;

5. It is forbidden to hang objects outside the support frame to avoid the support frame from tipping over due to heavy wheel weight;

6. At the construction site, it is not allowed to build a herringbone ladder on the work platform;

7. Two people should be prevented from moving from one side to the left and right of the herringbone ladder at the same time to avoid the steel scaffolding from tipping over;

8. The disassembly of steel tube scaffolding should be checked in all directions to see whether the connection of steel tube scaffolding, formwork support system, etc. comply with the structural regulations, and the disassembly work can only be carried out after the approval of the technical management process;

9. After the construction of the project, the steel scaffolding should be disassembled and assembled according to the upward and downward directions. The parts must be transferred one by one by manpower, or lifted one by one with ropes, or be disassembled in other special tools and methods that ensure that the steel scaffold will not be damaged. Install on the road surface, do not throw it down immediately.

 

 


Product detail pictures:

18 Years Factory China High Heat Resistant Casters Factories - EF8 Series- Threaded stem type(Round)(Chrome-plating) – GLOBE detail pictures

18 Years Factory China High Heat Resistant Casters Factories - EF8 Series- Threaded stem type(Round)(Chrome-plating) – GLOBE detail pictures


Related Product Guide:

To be a result of ours specialty and repair consciousness, our corporation has won a good popularity amid consumers everywhere in the environment for 18 Years Factory China High Heat Resistant Casters Factories - EF8 Series- Threaded stem type(Round)(Chrome-plating) – GLOBE , The product will supply to all over the world, such as: Casablanca, Serbia, Australia, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we are going to continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
  • High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
    5 Stars By Rebecca from Somalia - 2018.02.12 14:52
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Clementine from Egypt - 2018.08.12 12:27
    Write your message here and send it to us